The Buchan Group Fortitude Valley |
|
The roof of this 2 storey, 100 year old building was severely storm damaged and required replacement along with roof mounted air conditioning units. Intebuild was contracted to do this work along with associated repairs to the internal ceilings, all whilst the Buchan Group, a global architectural practice, continued its business as usual.
Having seen the standard of work and attention to detail displayed during the roof works, The Buchan Group invited Intebuild to manage its planned office refurbishment. This included repairs and levelling of floors, power and data upgrades, installation of new lighting, kitchen, carpets and workstations. The fitout was carried out in stages, with staff temporarily relocated within the same floor, so that normal business was able to continue. |
|